Structures that hold their nerve.

Catenar is a practice of sixteen structural engineers. We size the frames, bridges and awkward roofs that other people draw, and we show the working.

84
metres, the longest span we have drawn so far
212
structures standing, from garden rooms to a 27-storey tower

01 / What we do

Four kinds of problem, one desk.

All services

140+

frames designed since 2009

Frames, cores and foundations for homes, schools and workplaces, sized to be built by the contractor you can actually get.

  • Steel, timber, concrete and hybrids
  • Foundations and basements
  • Checked by a second engineer
A steel and concrete frame under construction with tower cranes above it

02 / Try it

Sketch a span.

Drag the span, pick a material and see roughly how deep, how heavy and how carbon-hungry the beam gets. It is a rule of thumb, which is how every real design starts.

6 m60 m

Material
It carries
Send this span to an engineer
24 m
1,600
mm deep at midspan
3.7
tonnes of its own weight
5.8
tonnes of CO₂e to make it

Steel truss, 16 bays, span-to-depth 15

03 / Built

Recent projects.

04 / Carbon

We publish the number on every frame.

Embodied carbon of the structure, in kilograms of CO₂e for each square metre of floor, counted the same way on every job and printed on the last drawing.

375

kgCO₂e/m², our average across the last six projects. A typical new frame is nearer 600.

600
Typical

450
Our limit

388
431
296
512
174
449
Millrace Harrow Lane Corn Exchange Quay Nine Foundry Yard Castle Street

Stages A1 to A5, structure and foundations only. Quay Nine went over our limit, and its case study says why.

1

of 6 stages

05 / How a job runs

Six stages, no fog.

1 to 2 weeks

Feasibility

One visit, the drawings you already have and a short report: what will stand, what it roughly costs and what could stop it.

You getA six-page note and three sketched options

06 / In their words

What changed, and who says so.

−38%

steel against the tender design

“They took a frame another firm had already designed and gave us the same building with a third less steel in it. The saving paid their fee four times.”
Imogen Castellane Imogen CastellaneDevelopment director, Harrow Lane

9

nights of river closure, not thirty

“The bridge arrived in three pieces and was lifted in nine nights. Catenar drew the lifting sequence before they drew the bridge.”
Tobias Wren Tobias WrenProject lead, Calder Weir Trust

48h

the longest we waited for an answer

“On site you learn quickly which engineers pick up. Ours did, every time, and came out in boots when a photo was not enough.”
Marguerite Oyelaran Marguerite OyelaranSite manager, Foundry Yard

Send us the awkward one.

A drawing, a photo of a crack or a span on the back of an envelope is enough to start. An engineer replies within two working days.

Built with Let's templates