Catenar is a practice of sixteen structural engineers. We size the frames, bridges and awkward roofs that other people draw, and we show the working.
01 / What we do
140+
frames designed since 2009
Frames, cores and foundations for homes, schools and workplaces, sized to be built by the contractor you can actually get.
84
metres, our longest clear span
Footbridges, roofs and canopies where the structure is the architecture, modelled for movement as well as strength.
92
% of a frame kept at Foundry Yard
Surveys, load testing and patient arithmetic that keep an old frame standing under a new use.
48
hours to answer a site query
Propping, sequencing and somebody who picks up the phone when the excavation finds a surprise.
02 / Try it
Drag the span, pick a material and see roughly how deep, how heavy and how carbon-hungry the beam gets. It is a rule of thumb, which is how every real design starts.
Steel truss, 16 bays, span-to-depth 15
03 / Built
84m clear span
Footbridge · Calder Weir · 2025
6.2m cantilever
Housing · Eastbank · 2024
31t of steel reused
Roof · Old Market · 2024
27storeys
Tall building · North Dock · 2023
92% of frame kept
Retrofit · Ironside · 2023
04 / Carbon
Embodied carbon of the structure, in kilograms of CO₂e for each square metre of floor, counted the same way on every job and printed on the last drawing.
375
kgCO₂e/m², our average across the last six projects. A typical new frame is nearer 600.
600
Typical
450
Our limit
Stages A1 to A5, structure and foundations only. Quay Nine went over our limit, and its case study says why.
1
of 6 stages
05 / How a job runs
1 to 2 weeks
One visit, the drawings you already have and a short report: what will stand, what it roughly costs and what could stop it.
You getA six-page note and three sketched options
3 to 5 weeks
We fix the grid, the material and the load path with your architect, and put a first carbon figure against each option.
You getFraming plans, key sections, carbon per m²
6 to 10 weeks
Every member is sized and every connection has a force on it. A second engineer checks the lot before it leaves.
You getCalculation pack and coordinated model
2 to 3 weeks
Drawings a fabricator can price without ringing us, and straight answers to the questions they ring with anyway.
You getTender drawings and specification
As long as the build
Inspections at the moments that matter, site queries answered within 48 hours, and no blame when the ground disagrees.
You getInspection notes with photos
1 week
As-built drawings, the final carbon count and a plain list of what the structure can carry in future.
You getAs-built set and a load guide
06 / In their words
−38%
steel against the tender design
“They took a frame another firm had already designed and gave us the same building with a third less steel in it. The saving paid their fee four times.”
Imogen CastellaneDevelopment director, Harrow Lane 9
nights of river closure, not thirty
“The bridge arrived in three pieces and was lifted in nine nights. Catenar drew the lifting sequence before they drew the bridge.”
Tobias WrenProject lead, Calder Weir Trust 48h
the longest we waited for an answer
“On site you learn quickly which engineers pick up. Ours did, every time, and came out in boots when a photo was not enough.”
Marguerite OyelaranSite manager, Foundry Yard A drawing, a photo of a crack or a span on the back of an envelope is enough to start. An engineer replies within two working days.
Built with Let's templates