Projects
The register.
Six of the 212 structures we have put our name to. Each one carries its headline number and the carbon it cost.
6 shown
-
84m clear span
Footbridge · Calder Weir · 2025388 kgCO₂e/m²
The Millrace Footbridge
Read the case study
-
6.2m cantilever
Housing · Eastbank · 2024431 kgCO₂e/m²
Harrow Lane Lofts
Ask us about this one
-
31t of steel reused
Roof · Old Market · 2024296 kgCO₂e/m²
The Corn Exchange Roof
Ask us about this one
-
27storeys
Tall building · North Dock · 2023512 kgCO₂e/m²
Quay Nine
Ask us about this one
-
92% of frame kept
Retrofit · Ironside · 2023174 kgCO₂e/m²
Foundry Yard
Ask us about this one
-
4storeys added on top
Retrofit · City centre · 2022449 kgCO₂e/m²
Castle Street Exchange
Ask us about this one
No projects of that type on the public register yet.
Sectors
Where the 212 stand.
Counted in March 2026. A structure is on the list once it carries the load it was drawn for.
- Homes and housing
- 88
- Workplaces
- 41
- Schools and public buildings
- 37
- Bridges and canopies
- 24
- Retrofit of existing frames
- 22