Why Tessel

A better house comes from a better place to build it.

Week twelve, two ways.

Drag the handle. On the left, a site-built house still waiting for its walls. On the right, a Tessel module the same week, dry, insulated and ready for its kitchen.

Finished open-plan living room with a staircase and a sofa
Open building site with a crew standing on a bare concrete slab
Site-built Tessel
340 homes delivered / 42 build stations / 0.6 air changes per hour / 97% of offcuts reused / 16 weeks in the factory / 1 crane day / 10-year structural warranty / 340 homes delivered / 42 build stations / 0.6 air changes per hour / 97% of offcuts reused / 16 weeks in the factory / 1 crane day / 10-year structural warranty /

What it is made of

Materials we would put in our own homes.

Bright interior with a timber and steel staircase

One price

The figure in the contract is the figure you pay. If our costs rise, that is our problem.

Less waste

Indoor building lets us reuse offcuts and order exactly what each home needs.

Warmer homes

Every module is tested for air leaks before it leaves, so the house you get is the one we drew.

Built with Let's templates