The process
Six phases. One project lead.
You talk to the same person from the first site visit to the day you get the keys. Here is everything they will walk you through.
Week 1
Site visit & feasibility
We measure the plot, check access for a 16-metre truck and a crane, and test the soil. You leave with a written feasibility note.
Weeks 2–4
Design session
Two half-days at our studio choosing the model, the layout tweaks and every finish, from tiles to door handles, with samples in hand.
Week 4
Fixed-price contract
One number for the house, delivery, crane and connection. Foundations are priced from the soil report, not guessed.
Weeks 5–10
Permits
We draw and submit everything the council needs and answer their questions. Most permits come back in five to six weeks.
Weeks 11–22
Factory build
Your modules move through forty-two stations. You can visit twice and get a photo update every Friday.
Weeks 23–26
Crane day & handover
Delivery at dawn, weathertight by dusk, then three weeks of connections, testing and a final walk-through with you.
What things cost
Site costs, before you ask.
The house price is fixed. These are typical ranges for the work on your plot, confirmed after the soil report.
Foundations
- Strip foundation, flat site$14–22k
- Screw piles, sloping site$18–30k
- Raised piers, flood zone$26–38k
Connections
- Water and sewer, under 30 m$6–9k
- Power and fibre$3–5k
- Septic system, rural plot$12–18k
Delivery
- Truck and crane, within 150 kmIncluded
- Each extra 100 km$1.8k
- Barge to an islandQuoted
Questions, by phase.
Who applies for the permit?
We do, in your name, and we answer every question from the planning office.
What if the permit is refused?
We redesign within the module grid at no cost and resubmit. Your deposit is refundable if no design can be approved.
Can I visit the factory?
Twice: once when your frames are standing and once before the modules are wrapped for delivery.
What happens if it rains on crane day?
Modules are wrapped and sealed. Only high wind stops a lift, and then we move the date by a day or two.
When can I move in after crane day?
Usually three weeks, while we finish connections, seal the joints and run the air-tightness test.
Who do I call if something breaks?
Your project lead for the first year, then our aftercare line, which answers within one working day.