The process

Six phases. One project lead.

You talk to the same person from the first site visit to the day you get the keys. Here is everything they will walk you through.

Construction crew in high-visibility vests standing on a concrete slab
01

Week 1

Site visit & feasibility

We measure the plot, check access for a 16-metre truck and a crane, and test the soil. You leave with a written feasibility note.

02

Weeks 2–4

Design session

Two half-days at our studio choosing the model, the layout tweaks and every finish, from tiles to door handles, with samples in hand.

03

Week 4

Fixed-price contract

One number for the house, delivery, crane and connection. Foundations are priced from the soil report, not guessed.

04

Weeks 5–10

Permits

We draw and submit everything the council needs and answer their questions. Most permits come back in five to six weeks.

05

Weeks 11–22

Factory build

Your modules move through forty-two stations. You can visit twice and get a photo update every Friday.

06

Weeks 23–26

Crane day & handover

Delivery at dawn, weathertight by dusk, then three weeks of connections, testing and a final walk-through with you.

What things cost

Site costs, before you ask.

The house price is fixed. These are typical ranges for the work on your plot, confirmed after the soil report.

Foundations

  • Strip foundation, flat site$14–22k
  • Screw piles, sloping site$18–30k
  • Raised piers, flood zone$26–38k

Connections

  • Water and sewer, under 30 m$6–9k
  • Power and fibre$3–5k
  • Septic system, rural plot$12–18k

Delivery

  • Truck and crane, within 150 kmIncluded
  • Each extra 100 km$1.8k
  • Barge to an islandQuoted

Questions, by phase.

Who applies for the permit?

We do, in your name, and we answer every question from the planning office.

What if the permit is refused?

We redesign within the module grid at no cost and resubmit. Your deposit is refundable if no design can be approved.