Projects / Footbridge / 2025
The Millrace Footbridge.
- Client
- Calder Weir Trust
- Architect
- Studio Ostrava
- Our role
- Structure and lifting
- Completed
- June 2025
The problem
A river 84 metres wide, no pier allowed in the water, and a weir upstream that could only be shut for a fortnight.
The answer
Two inclined steel arches tied through the deck, so the bridge pushes down on its abutments and never outwards. It was built on the bank in three pieces, each light enough for one crawler crane, and bolted together above the water at night.
We tuned the deck to stay out of step with walkers. A crowd crossing in rhythm moves it by less than the thickness of a coin.
- 84
- metres clear, bank to bank
- 61
- tonnes of steel, a fifth of it reclaimed
- 9
- nights of river closure, of the 14 allowed
Load path
Where the weight goes.
5kN on every square metre
The deck is a shallow steel tray with a resin surface. It is designed for a crowd shoulder to shoulder, which is far heavier than it looks.
The client
“The bridge arrived in three pieces and was lifted in nine nights. Catenar drew the lifting sequence before they drew the bridge.”
Tobias WrenProject lead, Calder Weir Trust Embodied carbon
388kgCO₂e/m² of deck,
against our limit of 450