Embodied carbon of the structure, in kilograms of CO₂e for each square metre of floor, counted the same way on every job and printed on the last drawing.
375
kgCO₂e/m², our average across the last six projects. A typical new frame is nearer 600.
600
Typical
450
Our limit
Stages A1 to A5, structure and foundations only. Quay Nine went over our limit, and its case study says why.