06 / In their words
−38%
steel against the tender design
“They took a frame another firm had already designed and gave us the same building with a third less steel in it. The saving paid their fee four times.”
Imogen CastellaneDevelopment director, Harrow Lane 9
nights of river closure, not thirty
“The bridge arrived in three pieces and was lifted in nine nights. Catenar drew the lifting sequence before they drew the bridge.”
Tobias WrenProject lead, Calder Weir Trust 48h
the longest we waited for an answer
“On site you learn quickly which engineers pick up. Ours did, every time, and came out in boots when a photo was not enough.”
Marguerite OyelaranSite manager, Foundry Yard Built with Let's templates