05 / How a job runs
1 to 2 weeks
One visit, the drawings you already have and a short report: what will stand, what it roughly costs and what could stop it.
You getA six-page note and three sketched options
3 to 5 weeks
We fix the grid, the material and the load path with your architect, and put a first carbon figure against each option.
You getFraming plans, key sections, carbon per m²
6 to 10 weeks
Every member is sized and every connection has a force on it. A second engineer checks the lot before it leaves.
You getCalculation pack and coordinated model
2 to 3 weeks
Drawings a fabricator can price without ringing us, and straight answers to the questions they ring with anyway.
You getTender drawings and specification
As long as the build
Inspections at the moments that matter, site queries answered within 48 hours, and no blame when the ground disagrees.
You getInspection notes with photos
1 week
As-built drawings, the final carbon count and a plain list of what the structure can carry in future.
You getAs-built set and a load guide